Data Modeling Methodology

How Measure models gaps in your data

Measure models a gap with the historical average when it can, and with the building classification average when it can't. Here's how each one is calculated:

Historical average

Modeled consumption = average daily usage × days in the gap

  • Measure looks at the 365 days ending with your latest actual bill in the inventory year.

  • That window needs at least 180 days of actual data. For the current year, the minimum is prorated to how much of the year has passed.

  • Each bill becomes a daily rate, and the rates are averaged across the days that have data.

For example, 546,000 kWh over 273 days is 2,000 kWh a day, so a 92-day gap is modeled at 184,000 kWh.

Building classification average

Modeled consumption = floor area × energy use per sq ft per year × (days in gap ÷ 365)

  • Factors come from the U.S. Building Performance Database (BPD), effective 2025, published February 2026.

  • Natural gas factors are in kBtu and are converted to MMBtu (× 0.001).

  • Measure matches the facility's sector, category and building type. If one is missing, it uses a broader factor, and the note says what to add.

For example, 263,716 sq ft × 37 kBtu × 0.001 × 273 ÷ 365 = 7,298.07 MMBtu.

FAQs

Why can't I model this activity? Usually there's no actual bill in the inventory year, there are fewer than 180 days of history, two bills for the same resource overlap by more than a week, or the activity is measured in spend, distance or weight. The building classification average also needs a facility with a floor area, and an inventory year of 2025 or later.

My facility is closing and has no bills this year. Can I model it? Not with the historical average. Use the building classification average if the facility has a floor area.

Does modeling account for seasonality? No. Both methods spread usage evenly across the gap.

Can I choose which months or which year to average from? Not today.

Can I model from an intensity, like energy per unit produced? Not today.

Can we change the 180-day minimum? No. It's the same for every organization.

What do I give an auditor? The note on each modeled record. It shows the source, the days modeled and the full calculation.

Did this answer your question?